Explore more publications!

I-29 northbound reconstruction and pedestrian bridge project begins April 13

FARGO, N.D. – Construction is scheduled to begin Monday, April 13, on northbound Interstate 29 at Hillsboro. The project is expected to be completed this fall.

On I-29, traffic will be reduced to one lane in each direction using the southbound lanes from mile marker 101 to 111. This is approximately three miles south of Hillsboro to north of the Mayville/ND 200 interchange.

The speed limit will be reduced to 65 mph and a 12-foot width restriction will be in place. Beginning in July, traffic on the overpasses at Hillsboro and the Mayville exit will be reduced to a single lane and controlled by signals.

The North Dakota Department of Transportation would like to remind motorists to slow down and use caution throughout the work zone.

For more information about construction projects and road conditions throughout North Dakota, call 511 or visit the ND Roads map at travel.dot.nd.gov.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share us

on your social networks:
AGPs

Get the latest news on this topic.

SIGN UP FOR FREE TODAY

No Thanks

By signing to this email alert, you
agree to our Terms & Conditions